KARACHI PORT PARAMETER | |||
OP-1 (POL PRODUCTS) |
MAX LOA 259 M MAX BEAM 44 M MAX DRAFT IMPORT 13 M MAX DRAFT EXPORT 13 M |
MAX DWT 75.000 TONS MAX DISPL 95.000 TONS |
Crude Oil & HSD. CHEM (PRIVATE) |
OP-2 (POL PRODUCTS) |
MAX LOA 259 M MAX BEAM 44 M MAX DRAFT IMPORT 11.88 M MAX DRAFT EXPORT 11.28 |
MAX DWT 75.000 TONS
MAX DISPL 95.000 TONS
|
Chemical, Ethanol, Mollasses
Crude Oil, Palm Oil, HSD & AV GAS.MOGAS.NAPTHA
.HSFO.LSFO.
|
OP-3 (POL PRODUCTS) |
MAX LOA 259 M MAX BEAM 44 M MAX DRAFT IMPORT 12.5 M MAX DRAFT EXPORT 12.25 M |
MAX DWT 75.000 TONS MAX DISPL 95.000 TONS |
Chemical, Ethanol, Mollasses Crude Oil, Vegetable Oil, Naphtha, Base LSFO, HSFO AV GAS, MO GAS |
BERTH NO. 1,2,3 | MAX LOA NR MAX BEAM NR MAX DRAFT 10.67 M |
Dedicated coal Berth & General Cargo / Bulk / Deep Draft all dirty Cargoes DB-1 CHEM. ETHANOL. MOLLASSES. | |
BERTH NO. 4-5 | MAX LOA 186 M MAX BEAM NR MAX DRAFT 10.75 M |
Deep Draft / Bulk / General Cargo / Cruise Ships / Naval Ships |
|
PICT BERTH NO. 6-9 |
MAX LOA 305 M MAX BEAM NR MAX DRAFT 13 M |
Dedicated Container Terminal in Private Sector PICT w.e.f 01-08-2005. |
|
BERTH NO. 10,11,12 | MAX LOA 250 M MAX BEAM NR MAX DRAFT 13 M |
Deep Draft / Bulk / General Cargo / Naval Ships | |
BERTH NO. 13 | MAX LOA 250 M MAX BEAM NR MAX DRAFT 13 M |
Deep Draft / Bulk / General Cargo / Naval Ships | |
BERTH NO. 18 | MAX LOA 140 M MAX BEAM NR MAX DRAFT 9.5 M |
General + Project cargo, Jute / Break bulk + Geared Containers |
|
BERTH NO. 19-21 | MAX LOA 160 M MAX BEAM NR MAX DRAFT 9.5 M |
General + Project cargo, Jute / Break bulk + Geared Containers |
|
BERTH NO. 22-23 | MAX LOA 150 M MAX BEAM NR MAX DRAFT 7.5 M |
General , Jute / Break bulk + Geared Containers |
|
BERTH NO. 24-25 | MAX LOA N.R MAX BEAM NR MAX DRAFT 10.0 M |
General + Project cargo, Jute / Break bulk + Geared Containers, Bulk Cement. |
|
KICT BERTH NO 26-30 |
MAX LOA 340 M MAX BEAM NR MAX DRAFT 13 M |
Dedicated Container Terminal in Private Sector KICT | |
OTHER INFORMATION | |||
1) There are no restriction on the beam for the general Cargo vessels when the ships are working with their own gear | |||
2) There are no Rail served Berths on East Wharves. | |||
3) 40 Tons shore crane available at berth No 18 | |||
4) Movement at Berth No.18 to 23 restricted to Day light only. | |||
5) Vessel drawing draft of more than the sanctioned depth will not be allowed to enter the Port. | |||
6) The above draught/ dimensions are subject to availability of sufficient tide/weather condition | |||
7) Deep draft vessels are to commence loading / discharging immediately after berthing. | |||
8) Ship on arrival at outer anchorage are to communicate correct draught and other vessels particulars. |